I-15 Technology Corridor Design-Build

C-470 Corridor Improvements

Paseo del Norte Extension

Central Park Boulevard over I-70

Pecos Street Bridge over I-70 Replacement

Fixing Access to Rural Missouri (FARM) Bridge Program Design-Build

I-435 South Loop Link Design-Build

I-25 and Cimarron Street (US-24) Interchange Design-Build
